2024 Water System Connection Charge per ERU
Water Supply System
Administration
Total Water Connection Charge $/ERU
$ 4,977
$ 765
————–
$ 5,742 **
**NOTE: There will be an additional fee to these connection charges for the actual cost of installation plus 10%. Installation includes the service pipe, connection from the main line to the meter base, the meter base and meter. Developers may install these service connections and provide all the material without an additional fee, provided all approvals and inspections are obtained.
2024 Sewer System Connection Charge per ERU
Collection System
WWTP
Administration
*Capital Reimbursement Charge $/ERU
Total Sewer Connection Charge $/ERU
$6,691
$ 2,300
$765
$3,938
————–
$ 13,694 **
*The capital reimbursement charge will be assessed on all new or increased connections to the sewer system and is calculated on the number of Equivalent Residential Units (ERU’s).